Basement renovation FAQ
Basement renovation questions, answered for the GTA and Ottawa
What homeowners ask before they finish a basement, answered in the first sentence. Permit answers name the city they apply to, because Toronto and Ottawa do not follow the same rules. Where we cannot give a number, we say why.
Cost and quotes
How much does it cost to finish a basement in Ontario?
In the GTA, a finished basement of about 1,000 square feet with a bathroom typically runs from roughly $50,000 to $100,000 before HST, depending on the scope. In Ottawa, published prices for a finished basement run from roughly $35,000 to $95,000 and are not tied to one size. These are market ranges, not our quote. Size, a bathroom, a kitchen or wet bar, layout changes, moving mechanicals, the level of finish and permits all move the number. Our Basement Estimator gives you a starting figure. The real number is your free itemized estimate, because we price the scope line by line and not per square foot.
What is the cost per square foot to finish a basement?
In the GTA, contractors who quote by the square foot typically publish roughly $50 to $100 per square foot to finish a basement, depending on the scope. We do not quote that way. A square-foot rate averages everything together, so a basement with a bathroom, a wet bar and moved mechanicals looks the same on paper as an open recreation room. Ottawa pricing is similar in structure and is confirmed in your itemized estimate. Our Basement Estimator gives you a starting figure. The real number is your free itemized estimate, because we price the scope line by line and not per square foot.
How much does a separate entrance or basement walkout cost?
In the GTA, a separate basement entrance or a walkout typically runs from roughly $15,000 to $30,000, depending on the scope, and some published prices run higher. Ottawa pricing is similar in structure and is confirmed in your itemized estimate. These are market ranges, not our quote. In Toronto, constructing a basement entrance needs a building permit. We price walkouts and separate entrances as their own line items, and they are usually not part of a standard finish. Our Basement Estimator gives you a starting figure. The real number is your free itemized estimate, because we price the scope line by line and not per square foot.
What does a basement renovation quote include?
An Assured Basements quote is an itemized scope with every line spelled out and priced, plus diagrams and floor plans drawn for your basement. It also shows what is not included. Mechanical and furnace rooms and storage rooms are normally left unfinished, and walkouts and separate entrances are priced as their own line items. The quote is free and comes with no obligation. Every client also gets a free 3D plan before we build. The 3D plan carries no prices. Those are in the scope.
Why do basement renovation quotes differ so much?
Basement quotes differ mostly because they do not describe the same job. One company prices a loose rate per square foot with a short description. Another lists every item. The totals cannot be compared until the scopes match. Our co-founders started Assured Basements after seeing companies that could not give accurate or detailed scopes. When you compare quotes, put them side by side and look for the same lines in each: bathroom, electrical, flooring, doors, permits. If a line is missing from one, ask whether it is included.
Does finishing a basement increase home value?
A finished basement adds usable living space to a home, and that generally counts in its favour at resale. How much it adds depends on the house, the neighbourhood and the market at the time, so we do not quote a return figure, and you should be wary of anyone who does. If resale is your main reason, ask a local real estate agent what homes with finished basements are selling for near you. About nine in ten of the basements we build are for the family's own use.
Timeline and process
How long does it take to finish a basement?
The build itself takes five weeks max, depending on the scope. That clock starts when construction starts. Before that come the phone consultation, the in-home consultation, the scope, the design meeting, your finish selections and any building permit. How long those take varies with your decisions and with your municipality, and a job that needs a permit has more steps before the build than one that does not. Your project app shows the schedule, so you can see where the job stands on any day.
Can I live in my home during the renovation?
Yes. A basement renovation is confined to one floor, so the rest of the house stays in use while we build. Expect noise during the day and trades coming and going, most of all during framing, boarding and taping. The build takes five weeks max, depending on the scope. Your project app shows the schedule, one project manager is your point of contact, and your WhatsApp group reaches the design team and the construction team in one thread, so you can always ask what is happening that week.
Do you use your own crews or subcontractors?
Our crews are in-house. Plumbing is done by licensed plumbers, electrical is done by master electricians, and the electrical work is inspected by the Electrical Safety Authority (ESA). One project manager is your point of contact from start to finish. The design team and the construction team are both in your WhatsApp group, so a question about the plan and a question about the build go to the same thread.
Permits and legal basement apartments
Do I need a permit to finish my basement in Toronto?
In Toronto, you need a building permit to finish a basement if the work includes structural or material alterations, new or changed plumbing or heating, underpinning, a basement entrance or a second suite. The City of Toronto says no permit is needed when the work has no structural or material alterations, creates no additional dwelling unit and installs no new plumbing. A new basement bathroom therefore means a permit. Toronto Building makes the decision for your house. Other GTA municipalities set their own rules, so check with yours.
Do I need a permit to finish my basement in Ottawa?
In Ottawa, yes, if the work covers more than 10 square metres, which is about 108 square feet and less than most basements. The City of Ottawa says a building permit is required for an alteration with a building area over that size. The City's finishing a basement page lists a first review of 5 business days. That is the City's own figure for a first review. It is not an approval date and not a promise from us.
What are the legal basement apartment requirements in Ontario?
In Toronto and in Ottawa, a basement apartment needs a building permit and passed inspections. Your municipality checks the plans against the Ontario Building Code at permit review, including the egress window rules for a floor with a bedroom, and it confirms what your basement needs for ceiling height, exits, fire separation and alarms. Toronto and Ottawa each publish their own guide. We do not promise an approval. We design and build a suite to pass permit review and final inspection.
How much does a legal basement apartment cost?
In the GTA, a basement apartment typically runs from roughly $60,000 to $115,000 where the ceiling height and the entrance already work, depending on the scope. In Ottawa, published prices fall into two groups: roughly $25,000 to $75,000 to convert a basement that is already finished, and more for a full suite build. These are market ranges, not our quote. A kitchen, a separate entrance and building code work push a suite above a family basement. Our Basement Estimator gives you a starting figure. The real number is your free itemized estimate, because we price the scope line by line and not per square foot.
Can I add a secondary suite to my house in Toronto?
In Toronto, adding a secondary suite needs a building permit. The City of Toronto's secondary suites guide describes it as a permit for an interior alteration to add a second dwelling unit, smaller in area than the primary unit, in an existing detached house, semi-detached house or townhouse. Toronto Building reviews the application and decides. These are Toronto's rules. Ottawa and the other GTA municipalities have their own.
Can I add a basement apartment (secondary dwelling unit) in Ottawa?
In Ottawa, a basement apartment needs a building permit before any work starts. The City of Ottawa now calls it an additional dwelling unit. Many people still say secondary dwelling unit, or SDU. The City allows up to two additional dwelling units on a lot with a principal dwelling, and no more than three units in total. Lots on a private well or septic system are limited to one. The unit must have separate access on the ground floor, unless building or fire codes allow another way.
What size egress window does a basement bedroom need in Ontario?
On a floor with a bedroom, an egress window must open to a clear area of at least 0.35 square metres, with no dimension under 380 mm. That is article 9.9.10.1 of the 2024 Ontario Building Code, as set out in a City of Ottawa building advisory. The window must open from the inside without tools. It needs 550 mm of clearance in front of it and a clear way out of the window well. The code is provincial, but your own municipality confirms what your basement needs at permit review.
Do I need a separate entrance for a basement apartment?
In Ottawa, yes in most cases. The City says an additional dwelling unit must have separate access on the ground floor of the principal dwelling, unless building or fire codes allow alternate means. In Toronto, building a basement entrance needs a building permit, and Toronto Building confirms at permit review how your suite has to be entered and exited. For a family basement with no second unit, a separate entrance is a choice. We price walkouts and separate entrances as their own line items, so you see the cost before you decide.
What happens if I finish my basement without a permit?
Finishing a basement without a required permit can lead to delays, legal action and having to remove finished work. The City of Toronto's wording is that failure to obtain building permits can result in costly construction delays, legal action and/or the removal of work already completed. Other municipalities enforce their own rules. Where a permit applies to a basement we build, the job ends with the final municipal inspection and the ESA electrical inspection, so the finished work has been inspected.
Design and the 3D plan
Do I get a 3D design of my basement before the build?
Yes. Every client gets a free 3D plan before we build. We scan your basement with Polycam during the in-home consultation, and our sales managers draw your layout from that scan using our own custom AI applications. You can walk through the plan and try finishes in it before anything is ordered. The 3D plan carries no prices. Pricing is in your itemized scope, line by line. The 3D plan is on us.
How do you measure my basement for the design?
We measure your basement on site and scan it with Polycam, a LiDAR scanning app, during the in-home consultation. Ceiling heights, mechanicals, windows, egress and access are all measured. The scan captures the bare shell, so the drawing starts from your real basement and real measurements, not from a rough sketch. Our sales managers then draw your layout from that scan using our own custom AI applications, and you get a 3D plan you can walk through.
Where do I choose flooring, tile and fixtures for my basement?
You choose your finishes in person at one of our two showrooms: our showroom and design centre at 1111 Finch Ave W, Unit 5, in North York, or our Ottawa showroom. The selection meeting is step six of our process. You pick flooring, tile, trim, doors, fixtures and glass with the samples in front of you. You can also try finishes in your 3D plan, which helps narrow the choice before anything is ordered.
Building the basement
Should I waterproof my basement before finishing it?
Yes, if the basement shows any sign of water. Deal with that before any finishing work goes on top of it. We look for where the water is getting in first: broken pipes, leaning window wells, leaks where service lines pass through the foundation wall, and foundation cracks. Then we waterproof from the inside. The repair goes into your scope as its own line. A dry basement with no history of leaks may not need waterproofing at all, and if that is what we find, we will say so.
What is the minimum ceiling height for a basement in Ontario?
The minimum ceiling height for a finished basement is a building code requirement, and your municipality confirms the figure for your house at permit review. We do not print a number here, because the requirement is not the same for every house and every use, and the figures quoted around the web do not agree with each other. We measure your ceiling heights during the in-home consultation and scan the basement with Polycam, so you know where you stand before any design work is done.
What flooring should I put in a basement?
Choose a basement floor that tolerates moisture, because it sits on a concrete slab below ground. That matters more than the look. Tile is the usual choice for a bathroom or a steam shower. For the main room, the right floor depends on how you will use it: a home gym, a home theatre and a play area ask different things of a floor. You see and handle the flooring options at our North York or Ottawa showroom, and the floor you choose is written into your scope as its own priced line.
How much does it cost to add a bathroom to a basement?
In the GTA, adding a three-piece bathroom to a basement typically runs from roughly $15,000 to $25,000, depending on the scope. In Ottawa, published prices run from roughly $10,000 to $20,000. These are market ranges, not our quote. We build basement bathrooms with licensed plumbers, and in Toronto the City requires a building permit when new plumbing goes in. The position of the bathroom is set in your 3D plan before the build. Our Basement Estimator gives you a starting figure. The real number is your free itemized estimate, because we price the scope line by line and not per square foot.
Financing, payment and warranty
How do I finance a basement renovation?
You can finance a basement renovation with us through Financeit, on approved credit. There are full, partial and deferred options. Full financing covers the whole project, partial financing covers part of it, and deferred financing delays the start of your payments. The rate, the term and what you qualify for are set out in your Financeit approval, and we cannot promise an approval. Ask about financing when you book your consultation, or call 1-866-580-8484.
What deposit and payment schedule should I expect?
Payments are tied to stages of the build and are set out in your agreement before any work starts. We do not print amounts on the website, because they belong in the agreement, beside your scope. Because the scope is itemized, with every line spelled out and priced, you can see what each payment is paying for. If you plan to use financing through Financeit, on approved credit, raise it at your consultation so the payments and the financing line up.
What warranty do you give on a finished basement?
Every basement we build is backed by the best real warranty in the industry and our own service centre. The warranty terms are written into your agreement, and we walk you through them before you sign, so you know what is covered before the build starts. If something needs attention after the basement is finished, the service call goes to our own service centre.
Are you licensed, insured and covered by WSIB?
Yes on insurance and WSIB: Assured Basements carries liability insurance and has WSIB coverage. On licences, the plumbing in your basement is done by licensed plumbers, the electrical work is done by master electricians, and that electrical work is inspected by the Electrical Safety Authority (ESA). Where a building permit applies, the job also ends with the final municipal inspection. Ask us about any of these at your consultation.
Where we work: GTA and Ottawa
Which areas do you serve in the GTA and Ottawa?
We renovate and finish basements across the Greater Toronto Area and in Ottawa. In the GTA that covers Toronto, North York, Scarborough and Etobicoke, York Region from Vaughan and Markham up to Newmarket, Peel and Halton including Mississauga, Brampton, Oakville, Burlington and Milton, and Durham from Pickering to Clarington. We also build in Barrie, Kitchener, Cambridge and Guelph. In Ottawa we cover Kanata, Nepean, Barrhaven, Orléans, Gloucester, Stittsville and Manotick. The full list is at the bottom of every page.
Do you renovate and finish basements in Ottawa?
Yes. We build in Ottawa, Kanata, Nepean, Barrhaven, Orléans, Gloucester, Stittsville and Manotick, and we have a showroom in Ottawa. The process is the same as in the Greater Toronto Area: a phone consultation, an in-home consultation with a Polycam scan, an itemized scope, a free 3D plan, a WhatsApp group with the design and construction teams, then the build. Ottawa permits go through the City of Ottawa, which has its own rules for finishing a basement and for additional dwelling units.
Are basement permit rules the same in Toronto and Ottawa?
No. Each city runs its own permit process on top of the Ontario Building Code. Toronto calls a basement apartment a secondary suite. Ottawa calls it an additional dwelling unit. Toronto lists a case where finishing a basement needs no permit: no structural or material alterations, no new unit and no new plumbing. Ottawa's page gives a size rule instead, a permit for an alteration over 10 square metres. Ottawa also requires separate ground-floor access for an additional unit, unless building or fire codes allow another way. We plan to the rules that apply at your address.
Ask us about your own basement
The most useful answers come from measuring your basement. Book a consultation and we will scan it, draw it in 3D and price it line by line. Or call 1-866-580-8484.
Service areas: Greater Toronto Area and Ottawa
Assured Basements renovates and finishes basements in the cities below, with showrooms in North York and Ottawa.
Greater Toronto Area and nearby
Toronto
- Toronto
- North York
- Scarborough
- Etobicoke
York Region
- Vaughan
- Richmond Hill
- Markham
- Aurora
- Newmarket
- King City
- Nobleton
- Stouffville
Peel and Halton
- Mississauga
- Brampton
- Oakville
- Burlington
- Milton
Durham Region
- Pickering
- Ajax
- Whitby
- Oshawa
- Clarington
Around the GTA
- Barrie
- Simcoe
- Kitchener
- Cambridge
- Guelph
- Stoney Creek
Ottawa
- Ottawa
- Kanata
- Nepean
- Barrhaven
- Orléans
- Gloucester
- Stittsville
- Manotick
If you are near one of these cities and not sure, call 1-866-580-8484 and ask.

